Skip to content

Stop paying for the same defect over and over

Every defect gets a number, its cost and a root cause, and the report can’t close until the fix is proven or the reason is written down. Quality software for manufacturers working to ISO 9001, AS9100 or IATF 16949.

Free to start: 1 plant, 5 users, with NCRs, root cause analysis and gages. No card needed.

NewAn AI quality assistant that answers from your own records, across every module.

Example nonconformance report NCR #10482: 12 of 120 parts affected by an undersize bore, cost of poor quality $402.14, root cause analysis RCA-2026-0142 in progress, report not yet closed.

  1. A numbered record every time it happens
  2. Dollars on every defect, not just a count
  3. Can’t close until fixed, or explained in writing
Example report. Illustrative data.

Today, one defect lives in four places

  • NCR form (paper)

    “What happens to the bad parts?”

    The box for it is blank.

  • NCR log.xlsx

    “What did quality cost us this month?”

    The counts are here. The dollars are not.

  • 8D template.docx

    “Did we ever fix the cause?”

    Started for the customer, stopped at the root cause, the fix never checked. When the part failed the same way, nobody could find it.

  • Calibration.xlsx

    “Is that gage still in calibration?”

    The sticker says November. The spreadsheet says October.

ProQualityLabs replaces all four

Example data
  • The defect, the quantities and what happens to every part

    Rework 4Scrapped 8
  • What it cost, on every report and for the plant each month

    Cost of poor quality

    Plant 1 · October 2026 · 9 NCRs
    $3,060.00
    September 2026 · 10 NCRs
    $3,190.00
  • A decision: investigate the root cause, or close it with a written reason

    • NCR #10479Ready to close: RCA done
    • NCR #10480Ready to close: no RCA
  • Calibration due dates and history for every gage (measuring tool), with a Monday email of what’s due

    CAL-0412Bore gage 25 mm
    Next calibrationOct 12, 2026Overdue

Bring your NCR log over from Excel: download the template, fill it in, and every row is checked before anything is saved.

What happens to a defect in ProQualityLabs

  1. Record it

    Whoever finds the defect records the part, how many are affected and what went wrong, and approvers are notified at once. The report lists earlier NCRs on the same part, or with the same defect for the same customer, and says if an earlier fix should already have stopped it. Here: 14 earlier NCRs on part 4412-02, all other defects, none an undersize bore. The last undersize bore went into a Word 8D, before ProQualityLabs, that stopped at the root cause with the fix never checked, and no search can reach it.

    Example: NCR #10482 is recorded, its status Needs RCA decision, with 12 of 120 parts affected by an undersize bore. The disposition and cost are not set yet, and the approvers are notified. Seen before: 14 earlier NCRs, 66 parts, $4,448.29 on the same part and revision, the latest NCR #10477 on Oct 9.

  2. Sort the parts and see the cost

    An approver decides what happens to the parts: rework, use as is, ship short (send fewer than ordered, with the customer’s OK) or scrap. They enter the unit price per part and any overhead, and ProQualityLabs calculates the cost of poor quality (COPQ): parts affected × unit price, plus overhead.

    Example: an approver sets the disposition, 4 rework and 8 scrapped, and enters a unit price of $28.40 for the 12 parts and an overhead cost of $61.34, so the cost of poor quality is $402.14.

  3. Decide

    Every report gets a decision: investigate the root cause, or close it with a written reason. There’s no other way to close it. RCA required is saved on this one, so it reads RCA required: not started until someone starts the root cause analysis.

    Example: the approver saves the decision "RCA required", the status becomes RCA required: not started, and the report shows "Next: start the root cause analysis" with an Initiate RCA → button. There is no way to close it yet.

  4. Fix the cause

    The team works it together: a standard root cause analysis or a full 8D, D1 to D8. It can’t be completed until the fix is marked Effective and the approver signs off, so on Oct 24 this one waits at D6 for two more lots, and the NCR stays open with it: Awaiting RCA. If a supplier caused it, send them a SCAR they answer on a private link, with no account.

    Example: RCA-2026-0142, an 8D, is at D6 on its own screen: D1 to D5 are done and the corrective action is marked Monitoring, so D6 and the RCA cannot be completed yet. NCR #10482 links to it with a View RCA-2026-0142 button; its decision is locked while the RCA is linked, its status is Awaiting RCA, and it cannot be closed yet.

And if it ever comes back

Once RCA-2026-0142 is completed, an undersize bore recorded on part 4412-02 again is flagged the moment the report is saved, as a repeat after a fix. The plant’s NCR reviewers, and the approver and leader of the 8D, are told to check whether the corrective action held.

Repeat after a fix: NCR #10482 had this defect on part 4412-02, and RCA-2026-0142 fixed it on Nov 4, 2026. Did that fix hold? Not part of the story yet: if RCA-2026-0142 is completed on its due date, Nov 4, 2026, and an undersize bore on part 4412-02 is recorded after that, saving the new NCR shows this.

Take your next defect from report to root cause, with its cost on it.

Get startedFree to start: 1 plant, 5 users, with NCRs, root cause analysis and gages. No card needed.

Keep the fix in place

NCR #10482’s investigation, RCA-2026-0142, found the cause: the insert change was missing from the Cell 4 setup sheet, so the boring insert wore past its life and cut the bores undersize. The fix is to change the insert every 400 parts on a tool-life counter. A fix that lives in one report gets forgotten, so follow this one into how the plant works, to the day the same defect starts again and is stopped before a single bad bore.

  1. Change the instruction · Documents

    Both of the 8D’s actions have run at the cell since Oct 22 on a marked-up setup sheet; Priya Nair writes them into Rev D of WI-0001: change the boring insert every 400 parts, and zero the bore gage at every second-shift start. Dana Whitfield approves it, because nobody approves their own work. Rev D is in use from that moment, Rev C is marked superseded, and the 12 people who work the operation are asked to confirm they’ve read it.

    From RCA-2026-0142’s corrective action.

    Documents: WI-0001, Cell 4 setup for the 4412-02 pump housing. Rev D, which adds the 400-part insert change and zeroing the bore gage at every second-shift start, approved and in use since Oct 26, 2026; Rev C superseded; 9 of 12 people have confirmed they read Rev D.

  2. Write it into the control plan · Control plans

    CP-0001 Rev 2 says what Op 20 checks, with which gage, how often, and what to do when it’s out: quarantine, notify the supervisor, raise an NCR. The 400-part insert change is a new line. Rev 1 stayed in force until Rev 2 was approved.

    The bore line is charted with SPC, in the last chapter.

    Control plan CP-0001 Rev 2 for part 4412-02, pump housing, approved. Op 20, finish bore on CNC lathe 3: bore diameter 25.025 ±0.025 mm, critical, bore gage CAL-0388, 5 parts 1 per hour, SPC chart SPC-0003, reaction plan quarantine, notify supervisor, raise NCR; insert tool life 400 parts, tool-life counter, check sheet, reaction plan stop, change insert, reset counter.

  3. Prove the gage can see it · MSA

    The 8D also found the bore gage wasn’t zeroed at shift start, and the control plan now trusts CAL-0388 to judge a 0.050 mm band. So before the chart starts, three appraisers, one from each shift, measure the same 10 bores three times each: a Gage R&R. The gage and the people use 8.3% of the tolerance (%Tolerance) and 8.8% of the total variation (%GRR), and tell 15 sizes apart (ndc 15): Acceptable on all three. When the chart moves, it’s the bore, not the gage.

    A contributing cause in the 8D (Measurements): the bore gage not zeroed at shift start.

    Measurement system analysis MSA-0001, Gage R&R (crossed), part 4412-02 bore diameter, gage CAL-0388, tolerance 25.000 to 25.050 mm: 10 parts, 3 appraisers, 3 trials. Completed, result Acceptable: %GRR of total variation 8.8%, %Tolerance (P/T) 8.3%, ndc 15. GRR is 8.3% of the tolerance. That is under 10%, so the gage is acceptable for this use. %Contribution to the total variance: repeatability 0.7%, reproducibility 0.1%, part variation 99.2%.

  4. Train the people who run it · Training

    The training matrix shows who is trained, expiring or missing. Alex Moreno, new on second shift, has read Rev D but still needs his practical sign-off, so he shows as partly done until it’s recorded.

    A contributing cause in the 8D (Man): a new second-shift operator not shown the insert check.

    Training matrix, Plant 1, 14 people. Boring insert change: Alex Moreno partly done, 1 of 2 parts, so 2 of 3 trainings in date (67%). Plant compliance 93%; 1 expiring, 1 expired, 1 not complete.

  5. Audit the floor · Internal audits

    On Oct 29 Rosa Delgado audits Cell 4 from a checklist, and every gap becomes a numbered finding. A spare bore gage left at the cell past its calibration date is F1, and goes straight to a root cause analysis, which closes the finding when it’s done. F3, still open: the tool-life counter is reset by hand, and only the operator’s own check-sheet entry says the insert was changed.

    Gage CAL-0412 has been overdue since Oct 12.

    Internal audit AUD-2026-0007, CNC machining - Cell 4, report issued Oct 29 with 3 findings. F1, clause 7.1.5, spare bore gage CAL-0412 past its calibration date and not tagged out of use, is in root cause analysis RCA-2026-0145, in progress; F2 and F3, minor nonconformities, are open; F3: the tool-life counter is reset by hand and only the operator’s own check-sheet entry says the insert was changed.

  6. Catch it before it’s a defect · SPC

    The bore is charted five parts an hour, as the control plan says. On Oct 30 the averages fall six in a row toward the lower limit: the counter had been reset without an insert change, the gap F3 noted the day before, so the insert ran past 400 parts and began to cut small. Every bore is still in spec, but the chart raises a signal. The operator stops, changes the insert and resets the counter, as the control plan says, and the signal is reviewed: cause Method, the hand reset. It never became an NCR.

    Had a bore been out, Raise NCR from the signal opens the report already filled in.

    SPC-0003, bore diameter, from control plan CP-0001 Rev 2, Op 20 CNC lathe 3: control limits 25.020 to 25.032 mm inside the specification 25.000 to 25.050 mm. On Oct 30 at 2:40 PM six falling points raised a signal (“6 points in a row all rising or all falling”) at 25.021 mm, still in spec. Reviewed at 3:10 PM: cause Method; the counter had been reset without an insert change, so the insert was changed and the counter reset. No NCR.

Example data, rearranged to fit your phone

Oct 30, 2:40 PMCaught at 25.021 mm, before a single undersize bore.

Start with your next defect: record it, see its cost, and take it to its root cause.

Get startedFree to start: 1 plant, 5 users, with NCRs, root cause analysis and gages. No card needed.

Ask how you fixed it last time New

NCR #10482, its 8D (RCA-2026-0142) and everything that followed are on record, down to the Oct 30 signal that stopped the same undersize bore before it was made. So the next time anyone asks how a bore problem on this part was fixed, or whether a chart is drifting, the answer is there. Ask the quality assistant in plain words. Answers come from your own records and link to the ones they use.

Finds how you fixed it

Question: Have we had bore problems on 4412-02 before? Did the fix work?

Answer: None of the earlier NCRs on part 4412-02 is an undersize bore, so NCR #10482 is the first on record. Its fix is in place and not proven yet, but the bore’s SPC chart has since caught a drift before any bore was undersize.

Data used: Plant 1

The only other NCR on the part that mentions the bore, NCR #10477 on Oct 9, read a bore oversize on a caliper. Re-checked on the bore gage it was in spec, so it was closed without an RCA.

NCRs matching "bore" - part 4412-02
  • NCR # 10482Open
    Oct 21, 2026, 4412-02, #C-1042

    Process: Bore undersize (12)

  • NCR # 10477Closed
    Oct 9, 2026, 4412-02, #C-1042

    Process: Out of spec (2)

Showing 2 of 2

NCR #10482 (12 parts NCR’d, $402.14) is being worked in RCA-2026-0142, an 8D now at D6, and stays open until it is done. Root cause: the insert change was missing from the Cell 4 setup sheet, so the boring insert wore past its life and cut the bores undersize. Fix: change the insert every 400 parts on a tool-life counter. A second action closes the escape: the bore gage is now zeroed at every second-shift start, so a small bore reads small.

Did it work? Not proven yet. Both actions are still marked Monitoring, with lot 1 of 3 recorded: 120 of 120 bores in spec.

Since the fix: one SPC signal on the part, on SPC-0003 this October: “6 points in a row all rising or all falling”. It has been reviewed, cause Method, and no NCR on the part that mentions the bore has been recorded since NCR #10482.

Looked up: NCR search, RCA record, SPC figures (4)

Next questions
  • Chart the NCRs matching "bore" by month for the last 12 months
  • Which NCRs matching "bore" have a root cause analysis?
  • Which NCRs matching "bore" are still open?
Example data, rearranged to fit your phone · asked Oct 31, 2026, 9:20 AM

Searches the NCRs and investigations you can open and says what was done and whether it held. When a fix is still being checked, it says so. It finds only what is on record: an 8D left in Word before ProQualityLabs, stopped at the root cause, can’t be found, which is why this NCR counts as the first. Every fix from here on can. Ask, and it draws an investigation’s process flow or fishbone too.

It uses retrieval-augmented generation (RAG): a question about your records is answered from the records you can open (your own plant, or every plant for a Company Admin), not from what the AI remembers. Charts and tables are built from those records; the words are the AI’s and can differ each time, so check key figures.

It declines questions about people and never records, edits or closes anything. Answers are written by Google’s Gemini model, which reads your question, the conversation so far and the records used; Google doesn’t train on them, and ProQualityLabs doesn’t keep your questions or answers. More in the privacy notice.

The next part is checked before a single one ships

AS9102 first articles, PPAP, receiving, in-process and final inspections, from customer drawing to released report. NCR #10482’s undersize housings were found after they were made; customer #C-1042’s next part, the 4415-01 pump end cover, is checked before any ships.

A first article, from the customer drawing to the AS9102 report

Three serials of the 4415-01 pump end cover, one result out of spec, caught here and not at the customer.

  1. Balloon drawing. Upload the customer drawing. On a PDF from CAD, ProQualityLabs reads the dimensions, tolerances, GD&T frames and notes and suggests a numbered balloon for each, with its limits. Nothing is added until someone accepts it, and the approved plan is reused for every inspection of the part. Inspection plan INSP-0001 Rev 1 for part 4415-01 Rev A, pump end cover: 12 suggested balloons accepted, 12 of 12 ready. Balloon 3 is a critical bore, Ø12.000 +0.018/0.

  2. Measure parts. Enter results by hand, paste them from Excel or import CMM files (PC-DMIS, Calypso, QIF, DMIS or any CSV), matched to the balloons, with unsure matches left for a person. Each value is judged exactly as measured. Balloon 3, a critical bore, reads 11.997 on SN 1001, 0.003 mm under its lower limit, caught on the first article before any cover ships. NCR #10483 is raised from that cell, already filled in. First article inspection FAI-2026-0001, serials SN 1001 to SN 1003, 36 of 36 measured. Balloon 3 measured 11.997 on SN 1001, out of spec; NCR #10483 raised.

  3. Issue FAI report. Someone other than the inspector approves and signs, which releases AS9102 Forms 1, 2 and 3, the ballooned drawing and one FAI package to download for the customer. NCR #10483 prints on Form 3, beside the reworked bore’s new result. AS9102 Form 3 for FAI-2026-0001, approved: balloon 3 re-measured at 12.012 after rework, nonconformance number NCR #10483. The FAI package is ready to download.

Example data, rearranged to fit your phone

Questions about your drawings or customer requirements? Email hello@proqualitylabs.com.

One closed loop, from a supplier’s bad lot to a warning before the next bad part

A plated bearing sleeve fails receiving inspection. Each step after it is a record in the same system: the NCR raised from the result, the supplier’s root cause and SCAR, the line it adds to the control plan, the SPC chart behind that line, and the quality assistant pointing at a drift while every sleeve still measures in spec. Then the next lot comes in and is measured as the new plan line says.

  1. 1. Receiving inspection

    Lot 2611 from Precision Plating Co. is checked against the part’s plan. One bore reads 17.994 mm, under its 18.000 minimum, so the cell offers Raise NCR.

    INS-2026-0001Receiving inspection

    Bearing sleeve · 3310-07 Rev C · Lot 2611

    Bore diameterØ18.000 +0.018/−0.000 mm17.994, out of specRaise NCR

    8 of 8 measured · 1 out of spec

    In-app notification: Sent for approval: INS-2026-0001 is waiting for your approval

  2. 2. Nonconformance

    Raise NCR opens the form with the part and revision filled in. The held lot is sorted: 6 of 200 sleeves are undersize, and the NCR prices them.

    NCR #104843310-07 Rev C

    Material: Bore undersize (6)

    Parts affected
    6 of 200
    Cost impact
    $110.40
    6 × $18.40

    In-app notification: New NCR recorded: #10484

  3. 3. Root cause analysis

    Requesting a SCAR from NCR #10484 opens its root cause analysis with the supplier as the source, linked to the NCR: a Standard RCA here, or an 8D.

    RCA-2026-0146
    SupplierStandard RCAIn progress

    Linked to NCR #10484 · Precision Plating Co.

    In-app notification: RCA Assigned: RCA-2026-0146

  4. 4. Request a SCAR

    The plater answers on a private link, with no account, in the RCA’s own steps from containment to corrective actions. Accept response fills the RCA’s empty fields.

    SCAR-2026-0007To review

    Precision Plating Co. · 3310-07

    Accept response

    In-app notification: SCAR-2026-0007 is ready for review

  5. 5. Control plan

    The fix becomes a line of the plan: the bore on 5 sleeves of every lot, on an SPC chart, with its reaction plan. Rev 3 is approved by someone who did not write it.

    CP-0005 Rev 3Approved

    Bearing sleeve 3310-07 · Op 10 Receiving inspection

    Characteristic
    Bore diameter
    Technique / gage
    Bore gage
    Sample
    5 parts · 1 per lot
    Control method
    SPC chart
    Reaction plan
    Quarantine, notify supervisor, raise NCR

    In-app notification: CP-0005 Rev 3 is waiting for your approval

  6. 6. SPC

    Start their charts opens SPC-0004 from that line. Each lot is a subgroup; from 25 lots the chart has limits and checks four rules, the spread and the spec, and a signal notifies the plant’s SPC team.

    SPC-0004In control

    Bore diameter · X̄-R chart · CP-0005 Rev 3

    In-app notification: When a rule breaks: Signal on SPC-0004 Bore diameter

  7. 7. AI quality assistant

    No rule has fired and every sleeve is in spec, but the last 5 lot means fall. The assistant shows it when you open its panel, before you ask anything, so you can call the plater before a bad lot is made.

    Worth a lookWorked out from your records when this panel opens. Not counted as a question.

    Watch1 SPC characteristic drifting before a rule firesSPC-0004: the last 5 means all falling.

    Ask about thisOpen

    Shown when the Ask panel opens on a new conversation. Not a notification.

  8. Back to 1. The next lot of 3310-07 is received and checked as CP-0005 Rev 3 says: the bore on 5 sleeves, onto SPC-0004.

In-app notification: An in-app notification goes out at this step.

Shown in the assistant’s panel when it opens on a new conversation. Not a notification or an email.

Example data, from one plant: the part, supplier, readings and record numbers are illustrative.

One company, many plants, and the right access for each person

The Company Admin sees every plant. Each plant is run by its own Plant Admin, who builds roles from the plant’s org chart and sets what each role can do, module by module.

How Example Manufacturing Co. is set up
  • Example Manufacturing Co.Company Admin · Chris Hartley
    • Plant 1Plant Admin · Tom Reyes
      • Quality manager · Quality
        • Quality inspector · Quality
      • Production supervisor · Production
        • Machinist · Production
      • Manufacturing engineer · Engineering
      • Maintenance lead · Maintenance
      • Sales representative · Sales
    • Plant 2Plant Admin · Marcus Bell
      • Its own roles and people
    • Plant 3Plant Admin · Nina Patel
      • Its own roles and people
Edit role: Quality inspector
Role name *Quality inspector
Reports toQuality manager
DepartmentQuality
Feature permissionsAllow allDeny all
  • NonconformancesView, Create, Edit and Initiate RCA
  • Root cause analysisView, Create and Edit
  • Gages and calibrationView, Edit and Weekly digest
  • InspectionView and Enter measurements
  • SPCView and Enter measurements
  • CustomersView
Plant 1, Settings: the Plant Admin edits the Quality inspector role, reporting to the Quality manager. Example data.
  1. The companyThe Company Admin adds the plants and their Plant Admins, reads every plant’s records and dashboards, and keeps the company’s customer and supplier lists.
  2. Each plantA Plant Admin runs one plant: its people, roles, departments and settings. Every person in a plant belongs to that plant alone and sees only its records.
  3. Roles follow the org chartRoles report to roles, each in a department, as the plant is organized. A manager can give a role only the rights they hold themselves.
  4. A permission matrix per roleView, create, edit and delete for each module, plus its extra rights in the More column: Approve NCR, Initiate RCA, Weekly digest, Approve and Enter measurements.

Ready when the auditor asks

Working to ISO 9001, AS9100 or IATF 16949? The records an auditor asks for are already linked to each other, signed by the right people and kept with their history. Certification is still between you and your auditor.

What the auditor asksWhere the answer is
Show me this nonconformance and what you did about it.The NCR, what happened to every part, what it cost, and the root cause analysis it went to, each linked to the other.
Who approved this, and when?Every sign-off carries the person and the date, and nobody approves their own work.
Did the corrective action work?An investigation can’t be completed until the fix is confirmed effective, and the repeat-defect check flags the defect if it comes back.
Is this the current revision?A document is in use from its approval, the old revision is marked superseded, and you can see who has read the new one.
Was that gage in calibration?Every calibration is kept with its certificates and is never edited, only voided with a reason. A failed one opens a suspect product review.
Is this operator trained?The training matrix shows who is trained, expiring, expired or missing, plant by plant.
Show me the first article report.AS9102 Forms 1 to 3, released by someone other than the inspector, and each stored PDF is checked against its fingerprint every time it is opened.

Your data

  • Each plant sees only its own records; a Company Admin sees every plant.
  • Signing in takes your password plus a code we email you.
  • Hosted on Google Cloud, with the records in MongoDB Atlas.
  • The AI reads only what the person asking can open, never changes a record, and Google doesn’t train on it. Export-controlled inspection plans and CMM programs are never sent to it.

More in the privacy notice.

Who we are

We are quality engineering professionals, and we want to make quality engineering as simple as possible, with software built for the way the work is done.

ProQualityLabs is how we are doing it: a defect, its cost, its root cause and the fix that keeps it from coming back, kept together with the gages, documents, training, audits and inspections around them, in one place instead of spread across files.

What you can hold us to

  • Your records are yours. A Company Admin can download every record and file at any time, and we do not sell them.
  • If your subscription ends, nothing is deleted: your records stay yours and downloadable. They are deleted only if a Company Admin asks, and only 30 days after asking.
  • We confirm any deletion in writing if you ask.

The details are in our terms of service.

ProQualityLabs is built by Farfield Labs in San Francisco.

Questions

Is there a free plan?

Yes. Free covers 1 plant, 5 users, 15 NCRs and 5 root cause analyses a month, 20 gages, with no card, and the core of the app: NCRs with their cost, standard root cause analysis, gages with their calibration history, SCARs to suppliers, dashboards and Help. The paid plans add more plants and people, no monthly limits, 8D, PDF reports, inspection, internal audits, documents, training, control plans, SPC, measurement system analysis and the AI assistant. The sign-up shows every plan and its price before you enter a card, and you can upgrade any time; what you recorded on Free stays yours.

How long does it take to get started?

You can be running the same day without us: sign up, confirm your work email and choose a plan. Then add your plants, in any country, and invite a Plant Admin for each by email. They set up roles that match your org chart and add their people, and from the next defect on, every NCR is recorded, costed and taken through to its root cause. It’s a web app, so there’s nothing to install, and Help and glossary in the app walks each person through their part.

What’s included?

Nonconformance reports with their cost, root cause analysis and 8D, SCARs and a supplier scorecard, gages and calibration history, measurement system analysis (Gage R&R, attribute agreement, bias, linearity and stability), internal audits, documents, training, control plans, SPC, inspection (first articles, AS9102, PPAP, receiving, in-process and final), dashboards for every plant and the AI quality assistant. When you sign up, the plan step shows exactly what each plan includes and its price before you enter a card. There’s no ERP integration or FMEA yet; email us at hello@proqualitylabs.com if you need something that isn’t here.

Can we bring our existing records over?

Yes. Download the NCR template, fill it in from your current log (one row per NCR), and import it: every row is checked before anything is saved, and any row that fails is listed with the reason. Gages, customers and people are added in the app, and calibration history builds up from the first calibration you record.

How is the cost of a defect calculated?

Each report has a unit price per part and an optional overhead amount, entered by someone with approval rights. ProQualityLabs multiplies the unit price by the parts affected and adds the overhead to give the cost of poor quality (COPQ), so nobody types the total. Each plant’s dashboard shows a 12-month trend, and the company view puts plants side by side.

Does it handle 8D reports?

Yes: run a full 8D, D1 to D8, or a standard root cause analysis with a named team, process flow, fishbone, 5 Whys and 5W2H, started from an internal defect, a customer complaint, a supplier problem or an audit finding, and export it as a PDF for your customer.

Can our suppliers answer a corrective action request?

Yes. Send a SCAR from an NCR or a supplier investigation, and the supplier gets a private link by email. They answer without an account, in the same root cause or 8D format your team uses, and you see when they opened it. You accept the answer or ask for changes, verify the fix and close it, and each supplier gets a scorecard of on-time answers and fixes that held.

Does it do first article inspection and PPAP?

Yes. Upload the customer drawing and ProQualityLabs suggests a numbered balloon for each dimension it reads; nothing is added until someone accepts it. Enter results by hand, paste them or import CMM files, and a second person approves the inspection, which releases AS9102 Forms 1 to 3, the ballooned drawing and one PDF package. PPAP runs at levels 1 to 5 with the Part Submission Warrant, and receiving, in-process and final inspections run on your own forms.

Who can see our records?

Plant users see only their own plant’s records, and Company Admins see every plant. Everyone who can open a report sees its cost, but only admins and roles that approve reports or start investigations can enter it. Root cause analyses, SCARs, audits, documents, control plans, training, MSA studies and inspections keep a history of who changed what and when, and a calibration is voided with a reason, never edited. The quality assistant follows the same rules. Signing in takes your password plus a code we email you.

Does ProQualityLabs use AI?

Yes. Ask the AI quality assistant about any of your records in plain words, from NCRs, root cause analyses and gages to SPC, control plans, inspections, audits, documents, training and suppliers, and it answers with text, charts, tables and diagrams and links the records it cites. It looks your records up first and answers questions about them from the records themselves, not from what it remembers. The figures come straight from your records, and Google’s Gemini model writes the words, without training on your data. It reads only records you can open, declines questions about people, doesn’t keep the conversation and never changes a record. AI also drafts an investigation’s problem statement, likely causes and containment for your team to accept or change, and reads drawings to suggest balloons. Costs, approvals and the rules for closing a report work without it.

Record your first defect today

You don’t need a demo, a consultant or a card to start. Sign up free for 1 plant and 5 users, and in a few minutes your company is set up.

  1. Sign up and confirm your work email.
  2. Start free, or choose a paid plan for more plants, people and features: the sign-up shows each plan and its price side by side.
  3. Add your plants, in any country, and invite a Plant Admin for each by email. They set up roles that match your org chart, add their people, and record the next defect straight through to its root cause.
Get startedFree to start: 1 plant, 5 users, with NCRs, root cause analysis and gages. No card needed.

Need a hand?

Help and glossary is built into the app. Or email us at hello@proqualitylabs.com, and we’ll help you get set up.

ProQualityLabs runs in any desktop or laptop browser. Nothing to install.